Flow of Transactions

Please inquire an equipment you want to purchase.

We seach a equipment you demand.

We check the equipment,and the performance and the opeation upon clients` request.

Heavy equipment Spec

Sumitomo Asfalt Paver HA60W-7
Paving width(m)
2.3~6.0stepless
Operating mass(kg)
13,650(TV)
Rated output(kw)
89.2
Exhast gas special
Specified special
Low noise specification
Low
Main application
Asfalt pavement
Time running
hourXXX
Cost
$XXX

Contract conclude upon your approval of specifications.

Basic trade agreement is made upon conclusion of contract terns.

Terms and conditions noted below are confirmed.

□Excange contract(to avoid exchange losses)
□L/C preparation
□Selection of international logistics
□Selection of ship and shippng company.
□Marine insurance.
□Secure storage location and space.

Bill for goods is settled according to the contract.

Heavy equipments are transported to the port and proceed to export.

Tranportation is made by liner ship and approximate departure and arival time are informed.
Both parties are not able to cancel the transaction at this stage.

Taking delivery is possible immediately after arrival.

Team YOSHIKAWA will offer an optional service for technicalguidance and maintenance at your location.


We offer tips and method of operation for each heavy equipment which are not described in technical manual.